Rates
-
Yearly Permit Fee - $10
Required to use facility
Must present weight ticket upon arrival
No dumping without permit
No dumping without attendant
All loads MUST be tarped
Material Fees
-
Construction
Minimum $15 under 500#
$45/ton over 500#
-
Rubble (non-construction)
Minimum $15 under 500#
$45/ton over 500#
-
Household
Solid Waste Pickup Load under 500# $15
(includes weight ticket cost & tax)
Solid Waste $52/ton over 500#
-
White Goods
$10/unit - must be freon free
$18/unit - not freon free
-
Contaminated Soil
Call ahead. Load must be approved
by State DENR
-
Tires
Passenger $4 (15" or smaller)
Pickup/Truck $10 (16" -20"
Tractor $20 (20" or larger)
Motorcycle $2